Structure 18-S, masonry surface structure
CONSTRUCTION
Method and Sequence
Built over a crack in the cliff. Only construction observed was a curved wall on the north side of the crack (see masonry screens for architectural details of wall). Rubble on a large boulder south of the crack is believed to be from the tower. Based on the relative positions of walls, this tower may have been built at the same time as or after the room (Structure 16-S) to the northwest. There is a curved wall just below the rim that appears to be part of this tower. Furthermore, at the base of the cliff and adjacent to the crack, is a curved wall that is interpreted as a tower (Structure 14-S). This may be the ground story of this tower.
Dimensions
Method of Roof Support
No evidence.
Roof Description