Structure 205, subterranean room
CONSTRUCTION
Method and Sequence
A rectangular pit was excavated from the prehistoric ground surface into undisturbed native sediment. The walls were lined with coursed masonry. A prepared adobe floor surface was constructed. The structure was roofed, probably with supports resting on top of the structure walls.
Dimensions
Method of Roof Support
no evidence
Roof Description
No evidence of roof support; resting on top of structure walls is inferred.