Structure 205, subterranean room

CONSTRUCTION

Method and Sequence

A rectangular pit was excavated from the prehistoric ground surface into undisturbed native sediment. The walls were lined with coursed masonry. A prepared adobe floor surface was constructed. The structure was roofed, probably with supports resting on top of the structure walls.

Dimensions

 
Actual
Inferred
Comments
Length
150
Measured east-west; wall to wall; Map 317.
Width
Height
Depth
164
 

Method of Roof Support

no evidence

Roof Description

No evidence of roof support; resting on top of structure walls is inferred.