Structure 121, masonry surface structure

EXCAVATION DETAILS FOR THIS STUDY UNIT

Selection Criteria
1-x-1 meter grid unit 63N 178E. Southeast edge of site. 10 m grid south of Structure 112.
Excavation Strategy
Random. Outer Periphery sampling stratum (SS 6).
Excavation Ended at
Natural strata.
Horizontal Unit(s)
Whole study unit N/E (Excavation Unit 669

Excavation Details for Excavation Units

In order by excavation unit number.

Excavation Unit

669

Location

Whole study unit N E.
Central portion of site.
Northeastern portion of Block 100; east of Structure 121.

Selection Criteria

Judgmental. Backhoe Trench 114 excavated to determine if another room existed east of Structure 104.

Excavation Strategy

Full cut.

Unit Ends at

Fill continued. Fill continued below Backhoe Trench 114 into Nonstructure 119 and Structure 121.

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Backhoe Trench
114
not further specified
Structure
121
masonry surface structure