Structure 242, other masonry structure
EXCAVATION DETAILS FOR THIS STUDY UNIT
Excavation Details for Excavation Units
In order by excavation unit number.
Excavation Unit
567
Location
Segment 1 N E.
Central portion of site.
East-central portion of Block 200; in Backhoe Trench 240; in fill within depression created by collapse of Structure 241.
Selection Criteria
Judgmental. East-west oriented backhoe trench excavated to test a remote sensing anomaly; exposed Structure 242 and Structure 241.
Excavation Strategy
Full cut.
Unit Ends at
Fill continued. Backhoe trench excavation ended when the upper lining wall of Structure 241 and wall the wall segments of Nonstructure 242 were defined.
Study Unit(s) Identified in this Excavation Unit