Structure 407, other masonry structure
EXCAVATION DETAILS FOR THIS STUDY UNIT
Excavation Details for Excavation Units
In order by excavation unit number.
Excavation Unit
542
Location
Segment 1 N E.
Southwestern portion of site.
Northeastern portion of Block 400.
Selection Criteria
Judgmental. Backhoe Trench 404 was excavated to test a remote sensing anomaly uncovering Structure 401, Structure 405, and Structure 407.
Excavation Strategy
Other. Structure 401 and Structure 407 were exposed in Backhoe Trench 404 (full cut) but was not further excavated. Structure 405 was excavated in strata subdivided into arbitrary levels.
Unit Ends at
Structure floor. Fill continued below Structure 401 and Structure 407 into Structure 405. Excavation ended at Surface 1 in Structure 405.
Study Unit(s) Identified in this Excavation Unit
DONATE TODAY
